Tuesday, February 2, 2010

More windows

More windows are being installed this week on the basement level and first floor of the SW facing side of the main house. Here you can see some of the windows that are already installed in the basement corner and the copper flashing being installed one floor above to the left:

DSCF1717

And here is a photo of the remaining double-hung window being installed in the basement:

DSCF1730

0 comments:

Post a Comment